{
  "constructed_available": "Defined only when NIB is present; NIB plus every other independent pathway observed on that day",
  "strict_all_components": "Sum only when all eight budget components are available",
  "strict_components": {
    "09522000": "Northern International Boundary river flow",
    "09531850": "Cooper Wasteway downstream of NIB",
    "09531900": "Wellton-Mohawk Main Outlet Drain Extension No. 3 below Morelos",
    "09532500": "Eleven Mile Wasteway",
    "09533000": "Twenty-one Mile Wasteway",
    "09534800": "Combined Sanchez Mejorada Canal crossings",
    "09531110": "Diversion Channel at SIB, added back after subtraction in 09534800",
    "09533300": "Wellton-Mohawk Bypass Drain at SIB"
  },
  "sanchez_detail_substitutes": {
    "09534500": "East Main Canal Wasteway",
    "09534300": "West Main Canal Wasteway",
    "09534000": "Yuma Main Drain",
    "09534550": "242 Lateral / Well Field"
  },
  "double_counting_rule": "Use 09534800 when present; otherwise sum whatever Sanchez detail gauges are available",
  "nib_precedence": "USGS 09522000 when available; otherwise IBWC bulletin NIB",
  "diversion_assumed_zero_before": "2004-10-06, based on documented operational start",
  "all_other_missing_components": "Missing; not filled with zero",
  "warning": "NIB is required, but downstream component availability still changes through time; this is not a uniform accounting definition."
}